The Following documents are considered as the basis for ETCS Level 2 Planning support in ProSig 7 EPU:
No. |
Directive |
Description |
Notes |
---|---|---|---|
[1] |
819.1340 |
Principles for the equipment of routes with ETCS |
Version 1.2 - 10.09.2009 |
[2] |
819.1343 |
Principles for the preparation of the design plan for the equipment of routes with ETCS Level 2 |
Version 1.2 - 11.09.2009 |
[3] |
819.1344 |
Principles for the preparation of implementation planning PT1 for ETCS Level 2 |
Version 0.79 - 05.04.2011 |
[4] |
819.1344V01 |
ETCS Level 2 entries/exits |
Version 0.79 - 05.04.2011 |
[5] |
819.1344V02 |
ETCS message & command connection for switches |
Version 0.79 - 05.04.2011 |
[6] |
819.1344V03 |
ETCS message & command connection for signals |
Version 0.79 - 05.04.2011 |
[7] |
819.1344V04 |
ETCS Data point table PT1 |
Version 0.79 - 05.04.2011 |
[8] |
819.1347 |
Additional information for dual equipment (ETCS L1 and L2, ETCS L2 and LZB) |
Version 1.22 - 28.01.2011 |
Table: Documents
The Planning documents listed under the following items are required for ETCS Level 2 planning (PT1 Planning).
•Planning of Construction areas
Description |
Type |
Notes |
---|---|---|
Building construction plans and relay room drawings |
- ETCS Central - All relay interlocking systems - Emergency operating station/on-site operation - Power supply calculations |
|
Table: Planning specifications for Construction areas
•Basic plans for the Project planning of the Data points and the Route atlas
Description |
Notes |
---|---|
Route overview plans, Schematic layout plans or Signalling layout plans |
|
Signalling layout plans |
|
Table of Main routes |
|
Combined main routes |
|
Signal tables 1 and 2 |
|
Point tables |
|
If necessary, with supplementary Flank protection tables |
|
Cable layout plans and Cable overview plans |
|
Table: Planning specifications for Basic plans and Route atlas