Process:
 

Import updated Topology-XML
 

 
Requirements:
 

Update the Track Topology
 

 
Description:

hmtoggle_plus1GND-based Project
hmtoggle_plus1XML-based Project

 
Procedure:

1.In ProSig, by using the Function 'Project Manager', open the Signalling layout plan of the project for updating.


Command Line: PRS_PROJEKTMANAGER

Ribbon: ProTop -> File -> Project Manager


 

2.Use the Drop-down list 'Set processing Frame' to set the desired construction stage in which the reallocation is performed. If necessary, a new construction stage can be created for the reallocation, see also Processing of Construction Stages, Step 2.


Ribbon: ProSig EPU -> Construction Stages EPU -> Set processing Frame


 
epu_bauzust_setzen
Illus.: Set processing Frame for Reallocation
 

3.Use the Function 'XML Import' to import the updated XML file, see also Import the PlanPro XML.


Command Line: PRS_XML_IMPORT

Ribbon: ProSig EPU -> Import/Export -> XML Import


 

4.Execute the Function 'Validate Location' and correct the assignment of the topological edges for all PSOs affected by the reallocation, see also Validate Location.


Command Line: PRS_VERORTE_VALIDIEREN

Ribbon: ProSig EPU -> Tools -> Verify -> Validate Location