The Process of ETCS Level 2 planning is based on ProSig-created PT1 Planning in a ProSig project. The Basic planning process is described under ETCS Level 2 Planning Processes. In the following, the individual steps specifically required for ETCS Level 2 planning are explained.
The Signalling layout plan requires the following steps to be performed:
•Importing ETCS Data Point Addresses
•Inserting ETCS Track Equipment (Data Points)