The PT1 of a safety related planning project consists of drawings and tables, including redundant information. The ProSig project ensures that the data is kept consistent in all products. A change in a document is automatically aligned with all other documents for which the change is relevant.
The following steps should be processed in detail:
•Deriving further Layout Plans