Process:
•Updating the Derived plans
Description:
Changes in the Signalling layout plan are automatically updated in the derived plans. The Derived plans are updated when the drawing is opened.
All changes to PSO that have been executed, since the last opening of the drawing are listed in a report and which can be checked via zoom functions.
Illus.: Drawing update message
•Changes that affect attribute values, position, or graphical representation of PSO are compared between all plan types.
•Movements and rotations of visible attributes of PSO are not synchronized into other plans.
•Movements and rotations in schematic Plans are not synchronized to other Plans.
•Construction stage markings are compared between all Plan types.
•All Project drawings should be opened (and thereby updated) at regular intervals.