The Process of ETCS Level 2 planning is based on ProSig-created PT1 Planning in a ProSig project. The Basic planning process is described under ETCS Level 2 Planning Processes. In the following, the individual steps specifically required for ETCS Level 2 planning are explained.

 

The Signalling layout plan requires the following steps to be performed:

 

Erstellen des Radio Block Centres

Definieren der ZUB Streckeneigenschaft

Importing ETCS Data Point Addresses

Assigning the ETCS Range

Inserting ETCS Track Equipment (Data Points)

Definieren der ZUB Bereichsgrenzen

Einfügen der ETCS Knoten

Automatic Creation of ETCS Track Edges

Editing the Speed Data